72 Bed Buildout

The Ohio State University | Columbus, OH

Sector

Healthcare

Method

General Contractor

Type

Shell Fit-Out

Size

78,500 SF

Value

$19,683,000

Completion

July 2018

Project Description

This project included the completion of shelled spaces on the 10th and 12th floors of the James Cancer Hospital and Solove Research Institute. The total area of the project included approximately 24,500 SF on the 10th Floor and 54,000 SF on the 12th Floor. Scope included interior architecture, plumbing, mechanical, electrical, and fire protection systems.

Our team achieved all 7 interim contractual milestones and completed the project on-time. We developed a value-add strategy to delete the buck hoist from the project and utilize existing elevators for construction resulting in $300,000 savings to the Owner. Throughout construction, numerous complex utility outages adjacent to critical cancer care areas were necessary, including shutdowns to re-route plumbing services, with no negative impact on hospital operations.

This project is registered with USGBC for a Silver LEED® certification.

Owner

The Ohio State University Facilities Operations & Development
Kristin Poldemann, Director of Projects

Architect

AECOM
Stephen Zilles, Sr. Project Architect